The work consists of constructing 12 new campsites within the South Bay campgrounds located at Horsetooth
Reservoir northwest of the City of Fort Collins. Approximately 5,600 cubic yards of Unclassified Excavation
(Complete in Place), 1,500 tons of Recycled Asphalt Base Course, 750 linear feet of 4 to 6 Sanitary Sewer
pipe, 950 linear feet of to 2 water pipe and 1,650 linear feet of buried electrical lines and conduit are
included in the work.