This project involves excavating the existing Highway pavement section; installing an asphalt concrete, asphalt treated base, and aggregate subbase pavement section; replacing an asphalt concrete swale; replacing guardrails; installing pavement markings; adjusting manhole frames and covers, as needed; adjusting centerline monuments, as needed; installing signage; and all other incidental work necessary to complete the project.