Mandatory pre-bid conference 02/03/2010
1 SP Routine Mowing (Primary System -
Multi-lane Divided) 1128 SHM
2 SP Clean Up Mowing (Primary System -
Multi-lane Divided) 564 SHM
3 SP Routine Mowing (Primary System -
Undivided) 200 SHM
4 SP Clean Up Mowing (Primary System -
Undivided) 100 SHM
5 SP Routine Mowing
(Secondary Paved System) 8 SHM
6 SP Clean Up Mowing
(Secondary Paved System) 4 SHM
7 SP Additional Mowing 120 ACR.