Furnish all equipment, labor, materials and supervision necessary to perform the work listed in the project specifications and illustrated on the project drawings. These include, but are not limited to, demolition of the existing cooling tower, removal of the existing pump and motor (return the motor to the owner), installation of the new tower (the new tower fan shall use the existing variable speed controller), new pump and new tower bypass valve. Also, the installation and set-up of the new and existing tower controls.