University is seeking bids from qualified vendors to provide for the extension of the chilled water piping on the Hall roof top penthouses and tie into the existing distribution system. The existing chiller and cooling tower, as well as the air-cooled unit and an abandoned chiller will be removed as part of the project. Prime bids will be accepted for: Heating, Electrical.