Mandatory Pre-Bid on April 7, 2010 at 10:00 AM. The scope of work for this project consists of installation of a HVAC unit that includes ASHRAE 90.1
compliance and advanced Indoor Air Quality (IAQ) that will support constant volume (CV) and variable air volume (VAV) operations.