Furnish all labor, materials, and equipment necessary to replace the existing pneumatic HVAC receiver controllers, thermostats, actuators, etc., controlling the HVAC systems in the Headquarters Building with a Direct Digital Controls (DDC) system for a complete and operational system per the specifications.