This document has expired, therefore the above link may no longer work.
Pre-bid conference on 04/20/2010. Removal of four (4) air-cooled heat pumps on a building mezzanine. The replacement will be phased with the new having fourteen (14) water cooled heat pumps on the mezzanine with a boiler and an outside dry-cooler.