Mandatory pre-bid meeting 04/27/2010.
The scope of work includes all materials, equipment, and labor for a complete installation of an HVAC packaged Data Room HVAC system, associated piping, ductwork, insulation, controls, electrical service, concrete pad and CMU wall at the College.