This project will require a building master plan that includes a final program of requirements, an assessment of the building envelope, a schematic master floor plan and cost information. The master plan will focus primarily on the first and second floors of the building, with intentions of renovating the second floor by phases. If continued, design development, construction documentation and administration will be required. The current facility is a three story, 110,000 GSF structure, built in 1916.