Contractor to provide all labor, materials and incidentals necessary for the replacement of damaged guardrail per the specifications listed herein. The Contractor will be responsible for the removal and disposal of all damaged posts and hardware.
Interested Contractors must perform an onsite inspection to determine the materials needed for the location.