•Relocation and reconstruction of an existing drainage channel
•Extension of the 1800x2400mm concrete box culvert
•Installation of approximately 450m2 of concrete cable mats
•Construction of approximately 175m2 of precast concrete retaining wall
•Fencing
•Grading and Landscape works