This project will include roadway overlay and widening of Greenwood Avenue to provide one 11' wide travel lane and one 12' wide travel lane in each direction, a 12' wide center left turn lane/median, and 11.5' wide sidewalks with 5' wide tree pits/planter strips on each side. At the 105th - 107th block of Greenwood, the roadway section will also include an additional southbound right turn lane. The project will provide a new traffic signal at North 105th Street, a new pedestrian-only signal at North 110th Street, illumination, drainage improvements, landscaping, Interconnect conduits, and channelization.