BASE BID : The Greenway by crossing under the Highway Bridge along the River. The greenway continues along the northern edge of the Golf Course to a trailhead
to be constructed at the entrance to a Metro Water Services pumping station. The
greenway then continues through the eastern edge of the course including the
provision of two pre-fabricated bridges and modifications to an existing golf cart bridge by adding safety rails
and to the parking lot and existing cart paths before connecting to the sidewalk.