Note: must register at site to access full RFP (registration is free).
Approximate Quantities
138 723 tonnes Supply of Aggregate - Dept. Source
Option
840 cubic metres Excavation
675 tonnes Granular Fill
116 300 tonnes Granular Base Course
21 050 tonnes Asphalt Concrete Pavement
Contractor to supply all materials.