The purpose of this Amendment is to incorporate a revise Section J (attached) of the solicitation clauses, to incorporate the Contract Price Schedule (attachmed), and extend the date and time offer are due to August 7, 2014 by 4PM PST.
SEKI, Grant Grove Wastewater Treatment Plant requires the replacement and upgrade of the existing oil fired heating equipment with propane fired units and providing an above ground propane storage tank with vaporizer and undergraound distribution piping. Additional requirements include the replacement of existing HVAC system, as described in Statement of Work.
David Lewis