Note: must register at site to access full RFP (registration is free).
Approximate Quantities
30 hectares Clearing and Timber Salvage
44 500 tonnes Supply of Aggregate - Dept.
Source Option
3 690 960 cubic metres Excavation
1 800 000 cubic metres kilometres Overhaul
32 000 tonnes Granular Fill
7 500 tonnes Gravel Surfacing