Project base bid scope includes approximately 2,500 feet of buried medium pressure plastic natural gas piping. Open trenching and boring methods of installation are both required. Additive alternate work includes new plastic piping system or insertion of plastic pipe in existing system of underground steel gas piping, with new risers, house regulators, and connections at six existing buildings.