This document has expired, therefore the above link may no longer work.
Provide all labor, materials, equipment, traffic control and incidentals necessary to install W-Beam guardrail, seven (7) terminal end sections eleven (11) W-Beam terminal end buffers and nine (9) concrete barrier rail connections.