The project scope includes replacement of approximately 360 lineal feet of existing concrete storm sewer piping with new PVC pipe, installation of one new catch basin, reconnecting existing catch basins and drains, and restoration of asphalt paving, concrete sidewalks and curbs. The project requirements have been superimposed over a copy of the original site plan (see attached Drawing).