GENERAL CONSTRUCTION SERVICES


Florida, United States
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

The project consists of furnishing all labor, materials, and equipment necessary for constructing a directional drill of 20-inch H.D.P.E. (S.D.R. 11) pipe along the Rickenbacker Intracoastal Waterway Bridge (Bay Bridge) from Sta. 152+62+/- to Sta. 190+ 28+/-, furnishing and installing approximately 3800 feet of 20-inch diameter SDR 11 HDPE and fittings; furnishing and installing approximately 70 feet of 16-inch ductile iron pipe; making two connections to a 16-inch water main installed by Department under Phase I, cleaning, testing and disinfecting the installed mains including the water main installed by the Department (Phase I and Phase II are approximately 4681 feet of pipe); traffic control; removal and disposal of existing 12-inch ductile iron water main attached to the Rickenbacker Causeway Bridge after 20-inch HDPE (SDR 11) is in service; and all other appurtenant and miscellaneous items and work for a complete, functional and satisfactory installation of the project located in, Section 13/18, Township 54S Range 41/42E, City of Miami, Miami-Dade County, Florida. 10% DBE GOAL REQUIRED, COMPLIANCE WITH THE DAVIS BACON ACT WAGE RATE PROVISIONS AND THE BUY AMERICAN REQUIREMENTS, AMERICAN RECOVERY AND RESTORATION ACT OF 2009, THIS IS A TWO ENVELOPE PROCESS ONE CONTAINING THE BID AND ONE CONTAINING THE FORM 400 SUB CONTRACTOR FORM. THE BID MUST INCLUDE A 5 PERCENT BID BOND.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP