VENDOR TO PROVIDE ALL EQUIPMENT, LABOR,
AND MATERIALS TO COMPLETE THE REMOVAL OF
OLD GATES AND INSTALLATION OF NEW GATES.
VENDOR TO:
01) REMOVE EXISTING ENTRY & EXIT GATES
02) REPLACE ELECTRICAL JUNCTION BOX NEAR
EXISTING ENTRY GATE
03) RUN NEW CONDUIT FROM NEW JUNCTION
BOX TO NEW GATE ACTUATORS.
04) INSTALL NEW KEYPADS ON EXISTING
MOUNT POLE
05) SAW CUT ASPHALT ACROSS DRIVES FOR
CONDUIT TO GATE ACTUATORS, PATCH W/
CONCRETE
06) INSTALL NEW SAFETY LOOPS ON ENTRY &
EXIT GATES, EXIT LOOPS ON EXIT GATE
07) CONNECT TO POWER FOR GATES &
JUNCTION BOX NEAR EXISTING ENTRY
GATE
** FENCE MODIFICATIONS WILL BE SUPPLIED
BY PARK
VENDOR TO INSTALL THE FOLLOWING:
1 EACH 14'5" CANTILIVER GATE, 48" TALL
1 EACH 12' CANTILEVER GATE, 48" TALL
8 EACH ROLLER
6 EACH 4" X 7' SCH 40 POST
6 EACH 4" POST CAPS
2 EACH LATCHES
REFLECTIVE GATE WARNING SIGNS
1/2 HP SLIDE GATE OPERATORS WITH SAFETY
LOOPS, SURGE PROTECTORS, 2 ACCESS
KEYPADS, EXIT LOOPS
MISC MATERIALS INCLUDE: ELECTRICAL,
CONCRETE AND ALL EQUIPMENT NEEDED TO
DO THE JOB.
AN ONSITE INSPECTION OF GATE AREA MUST
BE COMPLETED PRIOR TO BID SUBMISSION.
PARK OFFICIALS WILL SHOW VENDORS THE
LOCATIONS OF GATES TO BE REMOVED AND
INSTALLED.