Provide all necessary labor, equipment, and materials (unless stated otherwise) to perform Electrical Rehabilitation at Social and Hamlet Pump Stations in accordance with the National Electrical Code and the local utility company requirements.
The pumping stations are an integral part of the Woonsocket Flood Reduction Project, Woonsocket, RI. As such, the system may be required to be fully operational during the occasional storm event. The Contractor may be given as little as 6 hrs to make the Sluice Gates operational. During periods of flooding the contractor may be required to suspend work and modify the schedule accordingly.