Prior to submitting a bid, each bidder must visit the project site to familiarize himself/herself with any and all conditions that may affect the project. Site visits can be arranged by contacting individuals indicated in bid documents. Project scope shall include the following: Acquisition of all required permits (any permits required by the City of Goldsboro will be provided at no cost.), Furnish all labor, equipment, and materials necessary for the following: 1. The removal and proper disposal of five (5) existing fuel pumps and one (1) existing card reader, 2. Furnish and install five (5) new fleet fuel dispensers (three (3) dual hose, single product and two (2) single hose, single product) with all hoses, connectors, nozzles, swivels, etc. as described below and as required for proper operation. Location of dispensers shall be as shown on the enclosed diagram. 3. Furnish labor, material, and equipment to replace flexible connectors at all pumps and isolate connectors from the ground in containment sumps, to meet secondary containment requirements of 15A NCAC 2N .0900 and conduct a line tightness test. Provide documentation of successful LTT. 4 Furnish labor, material, and equipment to pull new control wiring into conduit to convert two (2) unleaded gasoline pumps and one (1) diesel pump from single hose to dual hose pumps. Location of pumps to be converted is shown on attached diagram. Existing wiring and conduit is to be used for other pumps. 5. Furnish labor, equipment, and materials to test pumps, meters, etc. for proper operation and calibration.
6. Furnish and install one (1) commercial grade outdoor card reader with all software, wiring, connectors, etc. as described below. Location of card reader shall be as shown on the enclosed diagram. 7. Furnish labor, equipment, and materials needed for system start-up.