The successful contractor shall provide all services including labor, materials, equipment, facilities, and shipping, necessary to provide SCPRT with the frames and panels for the FMTC Wayside Project. All work performed under this contract shall be fully compatible with the National Park Service wayside design standards and production methods according to the standards and procedures contained in this solicitation.