1. Remove and replace, to match existing precast, inner precast and precast spillways.
2. Precast to be laid on mortar base, or can be a continuous pore on site. Caulk and Seal as needed to
prevent any leakage or seeping of water through cement joints.
3. Remove existing tile and mastic. Replace tile with similar size. Color to be determined at later
date. Tile to be applied with acrylic modified mastic and grout. Supply owners with color samples
for approval.
4. Make structural repairs as needed around outer precast after removal of tile.
5. Sand blast floors and walls of both basins.
6. Apply bond coat to fountain walls and floors. Bond coat must cure for a minimum of seven days
before plaster color coat is applied.
7. Apply finish coat of Diamond Brite plaster coat. Color to be determined at later date supply
owner with color samples for selection.
8. Notify owner immediately of any unforeseen problems or necessary repairs that arise prior to
taking any corrective action. The owner must approve any changes in the work.