This project consists of adding and improving existing drainage features to reduce sedimentation along portions of the Forest. The road is predeominantly recreation and is used for a variety of ruses including pedestrians, bicycles, horses, and ATV’s. The project involves installing culverts, creating and re-establishing waterbars, creating and re-establishing drainage ditches, and stabilizing drainage outlets. The work also entails grading, shaping, and tree/stump removal.