This project includes the following improvements: demolition of pipe and concrete; installation of approximately 1,500 feet of 30-inch pressure pipe, some by open trench, some by sliplining and some inside a 42-inch casing pipe; installation of a 24-inch magmeter and 24-inch plug valve; removal of approximately 700 feet of 36-inch HDPE pipe and restoration of a levee.