The project involves the replacement of the existing 8-inch Force Main with approximately 1,850 Linear Feet of 8-inch, DR18 Polyvinyl Chloride (PVC) C900 and Protecto 401-Lined Class 52 Ductile Iron (DI) pipes, including fittings and appurtenances; excavation and backfill; connecting the new force main to the existing 8-inch force main at the A&B Wastewater Pump Station (WWPS) and to an existing sewer manhole at the WWPS; restoring existing improvements; temporary bypass facilities at the A&B WWPS; and all other incidental work necessary to complete the project.