Project Description
The project will require the renovation of the Student Center Food Court to include the selective demolition of existing spaces and replacing existing food concepts. The contractor will also be required to coordinate work to be installed by the others.
The project will require the contractor to protect adjacent occupied spaces not included in the scope of work.