Work consists of the following, but is not limited to: Remove old VCT in auditorium, . Remove carpet in auditorium, Patch / Repair floors as necessary. . Replace / Install Transition Strips as needed between finishes, Install New Flooring Laminate 16” x 16” F. Install New Carpet G. Cove base not neededm, Clean-up site upon completion of work.