This contract shall include the design, fabrication and delivery of a precast bridge structure meeting the requirements of the plans and specifications. Cast-in-place anchor bolts shall be provided along the top of the headwall for railing post attachment. It shall also include precast wingwalls and footings. On-site concrete work shall be limited to grouting and infill, no forming shall be required. All individual elements shall be positively connected together. A company representative shall be present on-site during the assembly of the structure. . The project is located in the Spring Mountains National Recreation Area of the Humboldt-Toiyabe National Forest, Clark County, Nevada, in Section 32, T 16 N, R 57 E. It is located approximately 35 miles north of downtown Las Vegas, Nevada. The project may be accessed from State Highway 157 (Kyle Canyon Road).
Tanya Spanfellner, Contracting Officer, Phone 208-373-4130, Fax 208-373-4197, Email [email protected]