Five (5) Modular Living Units for Lake San Antonio & Lake Nacimiento

  1. This RFP had a pre-bid event.
  2. This RFP was uploaded by the owner.


California, United States
Government : County
RFP

The County Parks Department is soliciting proposals from a qualified organization(s), hereinafter referred to as "CONTRACTOR", to provide; Proper removal and disposal of five (5) modular units, and purchase and installation of five (5) pre-fabricated new modular rental living units. Four (4) units to be placed at Lake San Antonio's North Shore, and One (1) unit to be placed at Lake Nacimiento Resort

Contractor Minimum Work Performance Percentage: CONTRACTOR shall perform with his own organization contract work amounting to not less than 50 percent of the original total contract price, except that any designated 'Specialty Items' may be performed by subcontract and the amount of any such 'Specialty Items' so performed may be deducted from the original total contract price before computing the amount of work required to be performed by the Contractor with his own organization.

5.2The County would have a preference on specification as outlined within the RFP. CONTRACTORS may propose alternatives which may prove to meet or exceed the County's specifications, and meet the installation needs of rental units prior to May 27th. The County will consider vendors' best overall proposals that meet or exceed the requirements specified within this RFP. CONTRACTORS may choose to bid on both the removal and disposal portion of the RFP and/or providing and installing of new units, or CONTRACTORS may bid on only one portion of the RFP.

5.3REMOVAL/DISPOSAL OF FIVE (5) UNITS
Removal of five (5) existing mobile homes, four single wide of varying lengths, one double wide unit approx 24' X 60" Removal to include all associated decks, stairs, interior furnishings and appliances Contractor to leave site clean of any foreign debris.
5.3.1Current units must be removed from the site which they reside, and properly disposed of off-site. Units must be transported and disposed of, at the nearest local landfill. These units CAN NOT be resold.

5.4FIVE (5) NEW UNITS
Specifications for park model cabins includes but is not limited to the following:
5.4.1Cabin should be 12' X 33' nominal size, excluding hitch, one bedroom with separate bunk area, fully functional kitchen, sliding glass door side entrance, dormer roof above SGD. Cabin to have brown rustic exterior appearance.

5.4.1INTERIOR
5.4.1.1Drywall, " taped, knock down texture throughout
5.4.1.2Cathedral ceilings, open beam appearance (wood finish beams / drywall between beams)
5.4.1.3Wood interior passage with heavy duty hardware
5.4.1.42" white/neutral faux mini blinds throughout except clerestory windows
5.4.1.5Oak Laminate flooring
5.4.1.6Upgrade lighting package
5.4.1.7Smoke detector
5.4.1.8Fire extinguisher
5.4.1.9LP Leak Gas Detector in units with propane
5.4.1.10Satin fixtures throughout
5.4.1.11Vinyl cove base throughout
5.4.1.12Ceiling fan with light in living room
5.4.1.13Pre-wire on wall for TV


5.4.2KITCHEN / BATHROOM
5.4.2.1Laminate countertops and backsplashes (better or equivalent)
5.4.2.2Full appliance packages (30" LPG range/oven, vent hood/microwave combo)
5.4.2.3GE 16 Cu Ft, double door, frost free , Energy Star rated
5.4.2.4Wood cabinet doors and face frames with hidden hinges or frameless cabinets
5.4.2.5Choice of upgraded cabinet pulls
5.4.2.6Drawers with double steel roller guides
5.4.2.7Satin finish single lever kitchen faucet (Delta or Moen, or equivalent)
5.4.2.8Stainless steel kitchen sink (Per floor plan)
5.4.2.9One piece fiberglass tub / shower (Lasco or equivalent)
5.4.2.10Bathroom exhaust fan

5.4.3EXTERIOR
5.4.3.1Colored metal roof, standing ridge, 25 year warranty
5.4.3.2Fiber cement lap exterior siding, brown wood tone over OSB wood wrap and building wrap, Hardy board, Certanteed or equivalent
5.4.3.3Fiber cement exterior trim around doors, windows and corners
5.4.3.4Exterior lights at each door
5.4.3.5Beige or white, vinyl or vinyl clad aluminum framed low "E" dual glaze windows (U35 or better) (or equivalent)
5.4.3.6Front and rear overhangs
5.4.3.7Exterior GFI receptacle
5.4.3.8Beige or white, vinyl or vinyl clad aluminum framed 6' sliding glass door (or equivalent)

5.4.4PLUMBING, ELECTRICAL, HEATING & INSULATION
5.4.4.1PEX waterlines with low point drain
5.4.4.2Residential grade U.L. approved electrical devices throughout
5.4.4.350 amp exterior main panel service with 36' supply cord
5.4.4.4Easy touch rocker light switches throughout
5.4.4.5R-14 fiberglass floor insulation
5.4.4.6R-11 fiberglass sidewall insulation
5.4.4.7R-30 fiberglass batt ceiling insulation
5.4.4.8Black iron gas pipe run to rear utility area (location approved by customer)
5.4.4.9Under sink waterline shut-off valves
5.4.4.1028 gallon electric water with metal pan and drain
5.4.4.11GFI protection in bath and kitchen
5.4.4.1240,000 minimum BTU propane gas furnace with A-coil installed, refrigeration lines to side of unit (location approved by customer)
5.4.4.13Insulated HVAC ducting

5.4.5CONSTRUCTION
5.4.5.1Full 10"/12" I-beam chassis construction
5.4.5.2Transverse 2" x 6" #2 or better fir floor joists 16" O.C.
5.4.5.3Engineered trusses ,7/12 pitch roof, 6" eaves
5.4.5.4Detachable hitch from main chassis
5.4.5.5Woven simplex underbelly material
5.4.5.65/8" OSB Wood Floor Decking
5.4.5.72" x 4" sidewalls 16" O.C.
5.4.5.826 gauge steel strapping for truss to sidewall and floor to sidewall strength
5.4.5.9RPTIA approved
5.4.5.10ANSI approved

5.5Prices quoted in this RFP shall include all labor, delivery, shipping, taxes, installation, design work, and any other miscellaneous costs necessary to fully complete the scope of work outlined in this Section.
5.5.1CONTRACTOR is responsible for providing appropriate level of staffing to complete the installation in approximately two week's timeframe. Completely installing according to documents with final sign-off of completed work by designated County representative.
5.5.2CONTRACTOR is responsible for providing complete oversight and coordination of the installation with the County to make sure installation coincides with the overall schedule.
5.5.3CONTRACTOR is responsible for participation in coordination and installation issues associated with installing electrical, data, plumbing and ventilation systems through and/or contained within the CONTRACTOR'S installed furnishings