Non-mandatory (but strongly encouraged) pre-bid conference 06/22/2010.
Note: link contains information for obtaining full RFP, which must be requested via phone.
Work consists of replacing the existing fire alarm system and adding fire alarm systems to various buildings as well as installing a fiber optics cable and all necessary attachments and power requirements as indicated. Bids will be received in accordance with State Procedures.