Work consists of in building 504 removing chilled water system, replacing ceiling, remove re-install / replace lighting fixtures, add 2 rooftop units, modify hydronic hot water system, repair roof around roof top units and add structural supports, modify electrical to serve roof tops, paint existing gypsum wallboard w/ mold encapsulating paint and in buildings 504 and 505 provide a new fire alarm system