Independently, and not as an agent of the government, the contractor shall provide all labor, materials, equipment and facilities (except as otherwise specified), necessary to fabricate interpretive wayside exhibit fiberglass embedment, high pressure laminate, and fused polycarbonate panels for outdoor use.
SHEILA SPRING
[email protected]