Bids are now being accepted by The City's Public Works Engineering Division for Fiber Optic Project. The scope of this project includes removal of approximately 100,410 feet of 6-Pair copper, install 106,500 feet of 24- Strand Fiber Optic Cable to various signals in the City, remove and install pull boxes in existing sidewalk and trench 5050 feet in existing roadway and install conduit.