This project shall result in the connection of one pair of existing dark fiber from each of four outlying locations to the Headquarters location and the connection of twelve pair of optic fibers from Town Hall to the Headquarters. This project will also provide the capability to pull additional cable between the handhold and the Headquarters if the need arises.