The work consists of furnishing all plant, labor and materials for installing the new 48 quote mark (RCP) culvert, flared inlet and outlet structure approximately 100 feet north of the existing culvert, using the existing culvert for drainage during construction. Work will also include installing a drop structure to dissipate the energy from the vertical elevation difference, include a riprap lined inlet channel, filling of the scour hole, removal of the existing CMP and flattening the riverside levee slope to 4 on 1.