"This project consists of approximately 2,800 linear feet of sidewalk installation along the north side of Thirteen Mile Road from
Middlebelt Road Westward to + 800 Ft West of Westgate Road. It includes placement of a pre-fab pedestrian bridge (60 x 8) over a
branch of the Pebble Creek." - RFP Author