The contractor shall furnish all personnel, management, transportation, materials, parts, supplies, tools, test equipment, technical manuals, and other related supplies (except as provided herein as Government furnished) as required and necessary to unbox/uncrate components, assemble and install eight Big Ass Fans for 18 CMS on Kadena AB, Okinawa, Japan. The ceiling fans will be installed in building 3339. The contractor will install all eight ceiling fans which includes routing electrical connections to the facility power grid. The contractor shall keep the equipment in good operating condition subject to the terms and conditions of this contract.
Jonathan L. Andrews, Contract Specialist, Phone 634-5967, Email jonathan.andrews.4@us.af.mil