Mandatory pre-bid meeting 04/29/2010.
2. Contractor shall field-verify all dimensions and conditions prior to beginning work. Contractor shall notify Architect
in writing of any discrepancies prior to beginning work.
3. Contractor is responsible for furnishing all materials and labor as needed to complete the full scope of work
contained within the bid documents.
4. Contractor shall be responsible for restoring the press metal cornice and egg & dart belt course at the top of the
building in accordance with the specifications and drawings within this bid documents.
5. Contractor shall be responsible for cleaning and restoring the limestone and masonry on the faade of the
building in accordance with the specifications and drawings within this bid documents.
6. Contractor shall be responsible for applying a water repellant to the masonry faade in accordance with the
specifications and drawings within this bid documents.
7. Contractor shall be responsible for the restoration of the window frames and lintels in accordance with the
specifications and drawings within this bid documents.
8. Contractor shall be responsible for pulling the PTAC vents and resealing and/or providing new head flashing in
accordance with the specifications and drawings within this bid documents.
9. Contractor shall be responsible for providing pedestrian sidewalk protection (i.e, scaffolding) to protect the public,
students, faculty and staff from work being performed above 6-0 of the sidewalk.
10. Qualified contractor shall have a minimum five (5) years experience in historic restoration work within a fifty (50)
mile radius of the City of Atlanta.