The RFP Database
New business relationships start here

FTU ADAL Fuel System Maintenance Dock for Hangar Altus AFB


Oklahoma, United States
Government : Military
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

This construction project is a design-bid-build with the work to be performed at
Altus AFB, Altus OK. The magnitude of this construction project falls between the range of $5 to $10 million dollars. The worked to be performed is to alter and add to existing fuel system maintenance Hangar 518 for a new dock to accommodate the taller KC-46A tail section, Work includes apron approach to the dock concrete pavement, large Hangar doors, structural, utilities, mechanical systems, communications support and fire detection/suppression systems to provide a complete and usable facility. This solicition will be solicted as an unrestricted procurement and the solcitiaion will be posted on or about September 15, 2015.


Nathan Ryan Kloeckler, Phone 9186697657, Email Nathan.R.kloeckler@usace.army.mil

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP