FR35.03.8 Upper Michigan Road over Hayes Brook AOP Culvert Replacement. Removal of existing culvert, casting in place of new abutments, installation of modular bridge provided by government, needed reconstruction of stream and roadway.
All Government Furnished materials will be located at the project site accept for the Prefabricated Steel Bridge Superstructure which will be located at the parking lot at mile post 2.37 on FR35, Upper Michigan Road, near the town line between Pittsfield and Chittenden, VT. The Prefabricated Steel Bridge Superstructure shall be transported from that location to the project location by the contractor.
Alan J. Zero, Contracting Officer, Phone 814-728-6288, Fax 814-726-1465, Email [email protected]