This project consists of, but is not limited to the construction of a reinforced concrete and armor stone universal shore fishing platform 20’ x 8’ and the 9’ extension of the existing concrete boat ramp on the shoreline of Gale Meadows Pond. Construction shall consist of installation of two geo-textile filter curtains, placement of an armor stone or approved precast interlocking concrete block base for the platform, a reinforced concrete slab, stone fill type II and dense graded crushed stone. A 4’ wide sur pak walkway will be built to connect the road on Gale Meadows Dam and the fishing platform; the walkway will have no greater than a 7.4% slope. Installation of the 9’ extension of the existing concrete boat ramp shall consist of excavation and the placement of 3 precast concrete planks and stone fill type I, covered with 3”-4” of screened stone. All excavated material shall be removed from the project and disposed of in an approved upland non-wetland area. A geo-textile filter curtain will be placed to enclose the area to be excavated, secured to the pond bottom and shoreline and floated on the water surface. After completion of all excavation the contractor shall place topsoil, seed and mulch all disturbed grass areas and perform any miscellaneous work necessary to complete the project. This project shall be completed by November 1, 2010.