Demolition and removals, drainage structure and pipe removal, grading, excavation, embankment,
installation of drainage structures and pipes, asphalt paving, pavement markings, installation of new taxiway
edge lights, illuminated guidance signs, and appurtenant work for a new Aircraft Engine Run-Up Area at
Runway 4R; and the establishment of three new geodetic control points per Federal Aviation Administration
(FAA) and National Geodetic Survey (NGS) requirements.