Washington River Protection Solutions, LLC (WRPS) as a prime contractor to the U.S. Department of Energy is issuing this Request for Expression of Interest (EOI) as a means of conducting market research to identify parties having an interest in and the resources to procure, fabricate and install pipe-in-pipe transfer lines from the on-site 242-A Evaporator and various pits within the AW Tank Farm. This will be a time and material contract. Expected Period of Performance for this scope of work is Late 2019 to Spring 2022.
Shawn Foster,, Procurement Construction Manager, Phone (509)376-3249, Email shawn_foster@rl.gov