Non-mandatory pre-bid meeting 05/11/2010. Bidders must visit jobsite prior to bidding.
Provide all labor, materials and equipment to:
1. Construct concrete paved ditches
2. Install one catch basin
3. Install on drainage line
4. Install two splash pads and headwall