Mandatory pre-bid meeting 02/24/2010.
The Project consists of Erosion Repairs. Major emphasis of this repair contract will be earthwork, including but not limited to erosion repairs, channel bottom scour repairs, rip rap installation, pipe installation, installation of concrete collars, installation of slope paving, and related items.