Mandatory pre-bid meeting 12/02/2009.
The flood Control District Project consists of channel repairs. Work includes: site preparation and restoration inlcuding clearing and grubbing and care and control of water and adjustment of yard drains; removal and disposal of sediment, vegetation and debris; erosion and slope repairs; sinkhole repairs; installing riprap linining; removing backslope interceptors and outfalls, installing new interceptors and outfalls and regrading backslope swales; and installing timber bents on outfalls.